Name | Type | Projected Amount | Details | |
---|---|---|---|---|
Restoration of Library building | Infrastructure | 2.500.000 | Add Status | Edit | Details | Delete | |
Restoration of old Principal building | Infrastructure | 2.000.000 | Add Status | Edit | Details | Delete | |
Solar Powered Street Lights | Infrastructure | 800.000 | Add Status | Edit | Details | Delete | |
APRST 1982 Batch Contributions | Infrastructure | 897.335 | Add Status | Edit | Details | Delete | |
Meet at Washington DC | Get-to-gather | 300 | Meet at Washington DC and discuss the projects for 2023 | Add Status | Edit | Details | Delete |
Plant Trees | School | 100 | Plant couple of trees at the School near the boundary wall | Add Status | Edit | Details | Delete |
Summer Camp in Science, Math and Technology | Academics | 10.000 | Conduct Summer Camp in Science, Math and Technology at the school | Add Status | Edit | Details | Delete |